Information Journal Paper
APA:
CopyLI, X., WANG, Y., & WU, C.. (2004). HEURISTIC ALGORITHMS FOR LARGE FLOW-SHOP SCHEDULING PROBLEMS. INTELLIGENT CONTROL AND AUTOMATION, 4(-), 2999-3003. SID. https://sid.ir/paper/635673/en
Vancouver:
CopyLI X., WANG Y., WU C.. HEURISTIC ALGORITHMS FOR LARGE FLOW-SHOP SCHEDULING PROBLEMS. INTELLIGENT CONTROL AND AUTOMATION[Internet]. 2004;4(-):2999-3003. Available from: https://sid.ir/paper/635673/en
IEEE:
CopyX. LI, Y. WANG, and C. WU, “HEURISTIC ALGORITHMS FOR LARGE FLOW-SHOP SCHEDULING PROBLEMS,” INTELLIGENT CONTROL AND AUTOMATION, vol. 4, no. -, pp. 2999–3003, 2004, [Online]. Available: https://sid.ir/paper/635673/en