مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

28
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

3
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

A Multi-Objective Location-Allocation-Routing Optimization With Time Window for Transferring Personnel From Residence to Work: A Case Study of Bistoon Power Plant

Pages

  25-42

Keywords

location-allocation (LA) 
location-routing problem (LRP) 

Abstract

 This paper presents a two-phase approach to design an optimal personnel transportation network for the Bistoon Power Plant. In the first phase, a mathematical model of location-allocation for locating bus stops and allocating staff to bus stops has been formulated with the objective of minimizing the total walking distance for staff. For the second phase, a mathematical model of location-allocation-routing with time window for selecting vehicles with the appropriate capacity for each route, locating the parking places (start nodes), vehicle routing, and trip scheduling is discussed with the two objectives of minimizing transportation costs and minimizing the maximum travel time of staff to ensure fairness among staff. One of the features of this study is the consideration of the distance between vehicle parking areas and the first demand nodes on each route in order to locate parking areas. Other expected side benefits of the implementation of this research are decreasing the total travel distances, traffic congestion, and air pollution. Despite the large number of nodes and data of the case study, the proposed mathematical models are solved by the exact solution method. In order to solve the two-objective model, the augmented epsilon constraint method has been used to find the Pareto solution set.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button