مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,122
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

SASANIAN CONSTRUCTIONS AT BISTUN: PROJECTS THAT NEVER COMPLETED

Pages

  77-106

Abstract

 There are lot of evidences about Sasanian period monuments in BISTOUN that according to result of researches, we believe these monuments has builed in late Sasanian period and Specifically during the reign of Khosrow II (590-628 A.D.). These monuments as “Sasani-Ilkhanid building”, “Farhad-Tarash”, “Pol-e-Khosrow bridge”, and “Pol-e-BISTOUN bridge” that we should add three CAPITALs that has insiced bust of Khosrow II. The important point as results of exploration and studies show, Implement all of these projects stopped suddenly and never completed in Sasanian period. For example, evidence can becited to show that arches over the openings in “Pol-e-Khosrow” and “Pol-e-BISTOUN” bridges Never has been made, Building operations “Farhad-Tarash” is never completed, and the rooms of “Sasani-Ilkhanid building” never has been formed. In this note has tried, by explaining and comparing these monuments and right dating offer for them, several possible reasons for why the proposed monuments will remain incompleted.

Cites

  • No record.
  • References

    Cite

    APA: Copy

    CHARMCHIAN, M., & MAFI, F.. (2012). SASANIAN CONSTRUCTIONS AT BISTUN: PROJECTS THAT NEVER COMPLETED. PAYAM-E BASTANSHENAS, 8(16), 77-106. SID. https://sid.ir/paper/128846/en

    Vancouver: Copy

    CHARMCHIAN M., MAFI F.. SASANIAN CONSTRUCTIONS AT BISTUN: PROJECTS THAT NEVER COMPLETED. PAYAM-E BASTANSHENAS[Internet]. 2012;8(16):77-106. Available from: https://sid.ir/paper/128846/en

    IEEE: Copy

    M. CHARMCHIAN, and F. MAFI, “SASANIAN CONSTRUCTIONS AT BISTUN: PROJECTS THAT NEVER COMPLETED,” PAYAM-E BASTANSHENAS, vol. 8, no. 16, pp. 77–106, 2012, [Online]. Available: https://sid.ir/paper/128846/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top