مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,558
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Identifying and prioritizing risk management indicators in dam-building projects using combination of AHP-ARAS in fuzzy environment based on PMBOK(Case study: dam-building projects)

Pages

  129-150

Abstract

 The main objective of this study is to identify and prioritize the risks of Construction projects with a focus on Dam-Building projects, according to PMBOK standard. Method of Failure Mode and Effect Analysis (FMEA) and its risks, using multi-criteria decision-making techniques namely Additive Ratio Assessment (ARAS) and Analytical Hierarchy Process (AHP) in a Fuzzy Environment are applied to try to provide practical solutions. 31 experts’ opinions are collected in tow steps which in the first one their opinions about the potential risks of Construction projects with a focus on Dam-Building projects are considered; while the second step expressed in qualitative terms for parameters probability of risks’ occurrence, severity of risks’ impacts, and capability of risks’ prediction before occurrence. Results show that the Risk Priority Numbers (RPNs) were calculated in a range of 80. 7 for lack of experienced project engineers to 274. 5 for the delay in paying contractors. Also “ delay in providing equipment” with the rate of 1. 000 was ranked as 1, “ financial issues” with the rate of 0. 980 was ranked as 2, and “ delay in notifying the plans with the rate of0. 909 was ranked as 3 were indicated as the most important potential risks in Dam-Building projects.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    ABDOLSHAH, MOHAMMAD, MOGHIMI, MOSTAFA, & KHATIBI, SEYED AMIR MOHAMMAD. (2020). Identifying and prioritizing risk management indicators in dam-building projects using combination of AHP-ARAS in fuzzy environment based on PMBOK(Case study: dam-building projects). ENVIRONMENTAL HAZARDS MANAGEMENT, 7(2 ), 129-150. SID. https://sid.ir/paper/378924/en

    Vancouver: Copy

    ABDOLSHAH MOHAMMAD, MOGHIMI MOSTAFA, KHATIBI SEYED AMIR MOHAMMAD. Identifying and prioritizing risk management indicators in dam-building projects using combination of AHP-ARAS in fuzzy environment based on PMBOK(Case study: dam-building projects). ENVIRONMENTAL HAZARDS MANAGEMENT[Internet]. 2020;7(2 ):129-150. Available from: https://sid.ir/paper/378924/en

    IEEE: Copy

    MOHAMMAD ABDOLSHAH, MOSTAFA MOGHIMI, and SEYED AMIR MOHAMMAD KHATIBI, “Identifying and prioritizing risk management indicators in dam-building projects using combination of AHP-ARAS in fuzzy environment based on PMBOK(Case study: dam-building projects),” ENVIRONMENTAL HAZARDS MANAGEMENT, vol. 7, no. 2 , pp. 129–150, 2020, [Online]. Available: https://sid.ir/paper/378924/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button